Geelong Bathroom Renovation Experts
Geelong Bathroom Renovation Experts supply solutions for all your bathroom renovations in Geelong and surrounding suburbs and towns.
Our bathroom designs are totally tailored for you, and our customer service, inspirational showroom, innovation, and craftsmanship are exceptional.
Things You Should Know About the
Bathroom Renovation Process
When you're ready to start the bathroom renovation process, here are a few things you should
know. First, your plumber will disconnect the water and install shutoff valves. Then, a demolition
crew will remove walls and tile. This will cause some damage to the walls, but patch ups won't
look good. Fresh drywall is much cheaper than plaster patch ups, so you might want to skip this
step if you can.
Installing new flooring
If you're planning to redo the flooring in your bathroom, tile floor installation is a great project for
the project. Tile is durable, and makes for a very elegant flooring solution for wet areas. Before
installing the tiles, however, it's important to prep the subfloor properly. If you don't do this
properly, your floor will crack and look bad. Here are some tips for ensuring a successful
installation.
Before installing new flooring in the bathroom renovation process, you must first remove the old
floor. This requires a good deal of back-breaking labor. Use power tools to speed up the
process. Then, take the old material to a waste disposal facility. If you're unsure where to
dispose of the old material, it's possible to rent a dumpster from a local trash agency. If you're
unable to hire a contractor, you can always rent a truck and haul the old material to the landfill.
Before installing new flooring in your bathroom, you should prepare the walls. A cement board is
a good backer for wall tiles. Besides cement board, you can paint your walls. Choosing a paint
with a satin or semi-gloss finish is best, since it will be exposed to moisture. Make sure the grout
matches the tile color, because grout is difficult to remove once it's installed. In addition to tile,
paint the walls in a color that matches the new flooring.
Before you begin installing new flooring, you must remove any existing bathroom fixtures. You
should remove all old fixtures, including cabinetry and drywall. Make sure you wear protective
gear and don't cut yourself when you work. Also, remember to turn off the water and electricity
before you start this process. Be sure to inspect for mold and water damage. Once the walls are
free of debris, you can install the new flooring. Once you have finished the demolition, you can
move on to installing the new bathroom tile.
Replacing old fixtures
During the bathroom renovation process, you'll probably be faced with several choices. From
selecting the material to installing new fixtures, choosing the right materials is an important part
of the process. You should keep some design decisions for later, though. Get an idea of the
price range and color schemes before you begin the project, and draw up a floor plan for the
new space. This will make it easier to get an accurate estimate from contractors.
Among the most affordable parts of the bathroom renovation process, replacing old lights is one
of the least expensive steps. This process requires relatively little construction, and new light
bulbs, paint, and plumbing don't add up quickly. Furthermore, you don't need to add new
plumbing or electrical features to replace existing fixtures. Also, you shouldn't need to get a
permit to replace existing lighting and plumbing, which saves you money on the entire project.
When replacing old fixtures, check for existing plumbing locations. Make sure to consider the
length and position of the pipes, as the new fixtures may not be the same size as the old ones. If
you plan to replace the toilet and sink, consider modifying wall studs, as new fixtures can be
larger or smaller than old ones. Additionally, the new fixtures might require additional
reinforcement on the floor. These are just some of the things to consider when planning a
bathroom renovation.
After completing electrical and plumbing work, it's time to install the new vanity and sink. Once
they're in place, you can install knobs and other features. Be sure to select coordinating finishes
for the new ones. You can also install door and baseboard trim after installing the new fixtures.
Make sure to have someone help you with these tasks so they don't damage the existing
surfaces. If you're new faucets aren't compatible, you can always hire a professional to install
them.
Installing new piping
During the bathroom renovation process, it is important to understand the different options for
installing new piping. The process of installing new piping may involve core drilling into concrete
to reach the exact location of the bathroom. Care must be taken to ensure that there is no
structural compromise, but it does allow for a pathway beneath the footings to be created. This
pathway is used for the installation of new sewage lines, which should then run to an outside
sewer point.
Before installing new piping, turn off water in the entire room. The plumbing may be exposed
and in need of replacement. Before starting, remember to turn off water and drain any existing
water lines. If you are replacing an existing sink or toilet, you can use push-fit plumbing
connectors to cap pipes within the walls. You will need to remove the old toilet, sink, and
baseboards, as well as any accessories in the bathroom.
Before you begin installing new piping, you must identify which walls you will need to move.
Once you have identified these walls, you can remove drywall and clear the space for the
shower or tub. Make sure to shut off power before beginning, and test the hotness of wires in
the wall before proceeding. Then, cut or remove any cables that may be blocking the way.
Remember to have a measuring tape handy for this process.
Plumbing is the next step in the bathroom renovation process. After installing the shower pan,
plumbing includes adding a waterline extension and modifying plumbing to add a second sink.
The plumbing process is often easier if walls are open, so it is better to hire a professional
plumber. Once the plumbing is done, electrical lines can be installed. Make sure the wiring runs
to the new fixtures. This is an important step in the bathroom renovation process.
Installing new tiles
There are several factors to consider when installing new tiles in a bathroom. You should ensure
that the floor is dry and flat before you begin. If your floor is uneven, use backer-board to cover
the seams and nails. When laying tiles, allow at least 24 hours for them to set properly. Once the
tiles have cured, you can grout them. This can be a time-consuming process, especially if you
are installing small tiles or ones with odd shapes. Moreover, grout sealing must be done 48-72
hours after you have completed the tile installation.
Before tiling the shower walls, you must remove the old tiles from the floor. It is also essential to
remove the shower head and handle. You will also need a hammer, utility knife, and putty knife
to remove old tiles. If you are renovating the entire bathroom, you should prepare the floor
beforehand to prevent any damage from the shower walls. Afterwards, use a prying tool to
remove the old tiles.
Before installing new tiles, lay them out to make sure you get the correct placement. Be sure to
check for warping or imperfections. Consider the patterns you would like to use when you are
laying the new tiles. Tiles with odd shapes should be kept away from the main sight lines, such
as doorways. However, if you need tiles with odd shapes or sizes, place them under vanities and
cabinets.
Once the walls are prepared, it is time to install the wall tile. Installing wall tile requires tiling the
walls before you can install the bathtub enclosure or the wall tile. Ideally, you should tile both
walls before installing the tub or shower. If you decide to tile the walls first, you will need to buy a
grout. Use matching colors of grout so that the finished bathroom looks beautiful and fresh.
Installing new trim
When installing new trim, make sure to take your old moldings out first. The contractor should
remove the old moldings, but you can also save them. If you plan to keep the same layout, the
existing moldings should suffice. Otherwise, use shaper blades to match the old ones. Installing
new trim will add a final touch to your bathroom. After all, the bathroom is supposed to be a
relaxing and enjoyable space to spend time.
Once the new materials are in place, you can start the painting process. Paint is much easier to
apply if the wall is free of obstructions, so wait until all of the other materials are in place before
starting. Then, install the new toilet and sink. When the entire project is complete, cover the floor
with drop cloths and add accessories. The bathroom renovation process is now complete. Keep
in mind that you should get an estimate from multiple contractors. A lower price does not mean
that the quality of work will be higher.
You can also paint the trim. Although this can take up more time, it will avoid any unsightly paint
marks. This method will also help you save money. Unlike the other steps in the bathroom
renovation process, painting the trim will not damage the walls, and you won't need a lot of extra
space. A sawhorse will help you set up the trim, and a drop cloth will help protect it from getting
dirty.
To install new trim, make sure to choose the right materials. For example, wood trim is a good
option as it can be stained to match the existing finishes. If you don't have the time, you can opt
for vinyl trim. Vinyl is durable and requires minimal upkeep. If you are considering upgrading
your baseboards, it would be a good idea to consider hiring a contractor. In fact, Tremendous
Tile Installations Inc. will be glad to help you!
CONTACT US
Geelong Bathroom Renovation Experts
McKillop Street, Geelong, VIC, 3220
(03) 9000 0301
WEBSITE:
EMAIL:
FOLLOW US
Experience the ultimate Bathroom Renovations Geelongwith our expert team.
ReplyDelete